Works direction for the requalification of safety barriers along an elevated urban road, rebuilding the reinforced-concrete kerbs that anchor them.
New kerb reinforcement and formwork along the carriageway edge


The project
The project upgrades the roadside safety barriers along an elevated stretch of urban road. Existing kerbs are removed and rebuilt in cast-in-place reinforced concrete, tied into the existing structure with drilled anchor bars, ready to receive the new barriers.
Works proceed section by section behind temporary protection so the road keeps running. We supervise each stage — demolition, anchoring, reinforcement, formwork and casting — and verify execution before the barriers are installed.
03Technical drawings
Drawings & diagrams
04Photographic record
On site

Fig. 02Formwork and reinforcement cage for the new kerb 
Fig. 03Reinforcement stored along the works corridor 
Fig. 04Anchor bars drilled into the existing structure 
Fig. 05Ducts laid along the works corridor 
Fig. 06Works corridor beneath the noise barriers 
Fig. 07Excavated verge before casting